3 comments

  • ChickeNES 1 hour ago
    Wild to think this is the same project featured in the third Die Hard, which turned 30 this year.
    • linksnapzz 48 minutes ago
      Should they ever reboot Die Hard; it'll need a sequence involving CA HSR infrastructure.
      • wtvanhest 44 minutes ago
        Die Hard: The most expensive mile
    • cogman10 40 minutes ago
      The project started in 1954. A 70 year old project.
  • mmooss 1 hour ago
    So many questions ... which probably have been asked on prior HN threads ...

    I wonder why 800 feet underground: Is that necessary to pass beneath all other infrastructure (to prevent flooding it?)? Remain beneath waterline to create negative pressure and reduce leaking? ?

    Also, what is the general mathematical relationship between depth, rock pressure / weight, and energy required to drill? That is, what is the proportion of energy required to drill beneath 800 feet of material compared to drilling beneath 400 feet?

    ...

  • Animats 1 hour ago
    They finally got Water Tunnel #3 close to completion? Work was stopped a decade or so ago, but apparently it was restarted.
    • toomuchtodo 55 minutes ago
      Still a bit more to go. Hopefully they offer some tours of the final phase before it’s flooded and no longer accessible for decades.

      > The Bronx and Manhattan already receive water from it, and the final phase — extending service to Brooklyn and Queens — is expected to be completed by 2032.